Sanitary ware installation has a lot of places to pay attention to, the details should pay attention to, the sanitary ware is installed well, it will bring a lot of convenience for future use, and if it is installed, it will greatly affect the quality of life. Today, Xiaobian takes everyone to carefully understand the installation precautions for sanitary ware. First, how to install sanitary ware? Sanitary ware inlaid wall tiles → suspended ceiling → laying floor tiles → installing toilets, washbasins, bathtubs → installing connections to drain pipes → installing lamps, sockets, mirrors → installing towel bars and other hardware accessories. 1, the toilet process Check the ground drain pipe → align the nozzle → level the alignment → draw the mark → punch the hole → apply the putty → set the rubber pad → screw the nut → mark the two sides of the water tank → punch → insert Bolt → æ» â†’ → back water tank hanging flat to find positive → screw nut → install back water tank water elbow → install the eight-character door → bend the mother light fork → insert the drift door and the eight-word door → tighten the nut. 2, the process of the washbasin Insert the expansion bolts → æ» â†’ → the tube rack is hung up → put the washbasin on the rack to find the level → water connection: washbasin → straighten → water connection. 3, the process of the tub Bathtub installation: → water installation → putty closed tight → water installation → flattening 4, the shower process Cold and hot water nozzles are flattened with test tubes → measure the size of the short section → install on the nozzle → wash the copper inlet of the shower with lead oil, wrap → nut tighten → fix on the wall → upper copper tube is installed in the three-port → The wood screws are fixed to the wall. 5, the process of the bidet The door cover and nut of the mixing switch and the hot and cold water door are leveled, → the water gate is installed → the nozzle core door is installed → the hot and cold water door outlet nut is tightened → the nut of the mixing switch is tightened → three water door covers are installed → the magnetic basin is installed Good → When installing the nozzle → Install the water outlet → When installing the portable lever → Adjust the positioning. Second, sanitary ware installation precautions 1, washing basin installation precautions (1) The washing basin product should be flat and non-destructive. The drain plug should have an overflow hole of not less than 8 mm in diameter. (2) When the drain plug and the sink are connected, the overflow plug of the drain plug should be aligned with the overflow hole of the sink to ensure the smooth flow of the overflow. After the insert, the upper end of the drain plug should be lower than the bottom of the wash basin. (3) After the washing basin is connected with the drain pipe, it should be firm and compact, and easy to disassemble. The joint should not be open. Silicone paste caulking is applied to the wash basin and wall contact. (4) The bracket fixing bolts can be galvanized bolts or galvanized metal expansion bolts of not less than 6mm (if the wall is porous brick, expansion bolts are strictly prohibited). (5) If the wash basin drain trap and faucet are plating products, the plating shall not be damaged during installation. 2, the installation of the bathtub considerations (1) When installing the skirting tub, the bottom of the skirt should be close to the ground. The floor should be reserved for 250~300mm holes in the drainage area to facilitate drainage installation. The inspection hole is installed in the wall of the bathtub drainage end. (2) The connection between the bathtub drain and the drain pipe should be firm and compact, and it is easy to disassemble, and the joint should not be open. (3) The height of all kinds of bathtub cold, hot water taps or mixing faucets should be higher than the plane above the bathtub 150mm, and the chrome plating layer should not be damaged during installation. The chrome cover should be in close contact with the wall. (4) The height of the fixed shower and hose shower can be installed according to relevant standards or according to user requirements. (5) The upper surface of the bathtub installation must be leveled with a horizontal ruler and must not be inclined. Apply a sealing paste to the side of the upper side of the bathtub and the wall. (6) Other types of bathtubs can determine the height of the upper surface of the bathtub according to relevant standards or user requirements. Then install the tub after laying two brick foundations. For example, if the side wall of the bathtub is built, the inspection hole should be set at the drain of the bathtub or the inspection hole should be opened on the wall of the drainage end. 3, toilet installation precautions (1) The installation angle of the water supply pipe is generally 250mm from the ground to the center of the angle valve. If the installation of the one-piece toilet should be based on the height of the water inlet of the toilet, but not less than 100mm, the center of the angle valve of the water supply pipe is generally sewage. 150mm to the left of the tube center or according to the actual size of the toilet. (2) Low-water tank toilets are equipped with galvanized anchor bolts or galvanized metal expansion bolts. If the wall is porous brick, it is strictly forbidden to use expansion bolts. Soft gaskets should be used between the water tank and the nut. It is strictly forbidden to use metal hard surface. (3) With the water tank and the connected toilet, the back of the water tank should be no more than 20mm from the wall. (4) The installation of the toilet should be fixed not less than 6mm galvanized expansion bolts, and the soft gasket should be fixed between the toilet and the nut. The sewage pipe should be exposed to the ground 10mm. (5) The height of the overflow pipe in the flushing tank should be 30-40mm below the wrench hole to prevent the water from overflowing from the wrench hole when the inlet valve is damaged. (6) When installing the toilet, first apply the putty around the bottom drain, then align the toilet discharge to the sewage pipe and slowly press it down to fill it tightly, then tighten the gasket nut to remove the extruded putty. After filling with the putty in the periphery of the base, immediately wipe it with a wire or a rag. Third, pay attention to the details of installing sanitary ware 1. Do not damage the waterproof layer. If it has been damaged or has no waterproof layer, it must be waterproofed first and tested by water leakage for 12 hours. 2. The sanitary ware is fixed firmly and the pipe interface is tight. 3, pay attention to the protection of finished products to prevent bumps and sanitary ware. 4, the leakage of the base of the toilet has a great impact on the bathroom environment, so before installing the toilet, first put the putty around the bottom drain, and then press the toilet outlet to the sewage pipe and slowly squeeze it down. After confirming the compactness, tighten the gasket nut to remove the extruded putty. After filling the compact with the putty around the base, wipe it with a wire or a rag. 5, the focus of the installation of the bathtub, pay attention to the close of the putty tightly, after the installation of the water, and finally try to find the right. 6. The installation focus of the shower is the hot and cold water nozzle. To install the shower, first use the test tube to level the cold and hot water nozzles, and measure the size of the short ruler and install it on the nozzle. 7. The installation of the washstand is mainly based on anti-leakage. The installation sequence is from bottom to top, first the down pipe, then the washbasin, and finally the drain plug and the tap. The joint between the washbasin and the drain pipe should be kept open, and the silicone paste joint should be applied to the contact part of the wall. I believe that after reading these introductions, you have already had a deeper understanding of the sanitary ware installation. Pay attention to these installation details in the future installation of sanitary ware, and bring a clean and satisfactory bathroom to the home.
Product advantages:
1. 100% fresh aluminum alloy 6063-T5, iron containing is less than 2% , sturdy and durable, full thickness 3.0mm.
2. 3 layer PVDF color coating, thickness more than 80 microns, excellent weather resistance, never fade,More upscale appearance.
3. 100% fresh virgin Bayer Polycarbonate Sheet, 30-50 micron anti-UV coating, can withstand 75% ultraviolet light, impact strength is 300 times that of ordinary glass, 10 years warranty.
4. The motor adopts the domestic leading brand and is guaranteed for 10 years.
5. Rugged and novel internal design, 3.0mm thick aluminum alloy profile, 4-10mm high strength impact resistant endurance board, can withstand snow loads of 30 to 45 cm.
6. High anti-aluminum structure provides maximum safety even in strong winds (strongest 12 winds) (34m / s strong wind).
Novel structure and easy installation
7. Packaging, protecting the product during shipping and making it easier to install.
Patio Enclosure Solarium,Patio Enclosure Under Deck,Patio Enclosures 4 Season Sunroom Pictures,Pool Cover Dome FOSHAN KASO BUILDING MATERIAL CO.,LTD , https://www.kasocover.com